06.04.2022 | Empire Riverside Hotel, Hamburg
English versionRailway Diagnostic and Monitoring Conference 2022
Downloads
As a participant of the event, you have received the access data for the download area by e-mail.
You were not present as a participant and still want to get access to the download files? Then please contact us for a download license.
List of participants
Here you can find the list of participants and the complete recording of the livestream.
Herunterladen HerunterladenThe WTMS plan of DB Netz
Valentina Bon, Senior Consultant Wayside Monitoring and operational support, DB Netz
HerunterladenExperience with checkpoints and data exchange at ÖBB Infra
Günther Schifböck, Technologymanager Train Running Checkpoints, ÖBB Infra
HerunterladenExperiences and challenges in using WTMS data
Mirko Leiste, Project Manager Technical Innovations, VTG
HerunterladenOn-board and Wayside Train Measurement: Enabler of Efficient Operations
Dietmar Maicz, Projektmanagement Railway, Hottinger Brüel & Kjaer Austria GmbH
HerunterladenHigh system availability through smart monitoring and predictive maintenance
Johannes Emmelheinz, CEO Customer Services, Siemens Mobility
HerunterladenFrom ear to eye: acoustic sensors and VR/AR hardware are the gate to visualize, simulate and instruct a condition monitoring system
Jörg Jonas-Kops, CEO and co-founder, nxtbase Technologies GmbH
HerunterladenThe stony way to CBM - Prerequisites for the use of monitoring in maintenance of rolling stock
Dr. Gert Fregien, CEO, TENSOR
Herunterladenconnect@rail – Digital solutions for infrastructure and driveline monitoring
Eduardo Behlok, System Engineer, ZF Group
HerunterladenInterchange and Innovation: Accelerating Implementation of Technology into the North American Rail Network
Scott Cummings, AVP Research & Innovation, TTCI
HerunterladenValue Creation from WTMS Data with Multi-Stakeholder Engagement – Opportunities and Challenges
Wolfgang Birk, Head of Analytics, PREDGE
HerunterladenValue based international exchange of Data Services
Stefan Distlberger, Managing Director, voestalpine Signaling
HerunterladenHow to succeed with WTMS - Lessons learned from monitoring projects in the railway system
Sascha Büchner, Managing Partner, Brockmann&Büchner
"After the presentation, we were asked whether the projects mentioned had a concrete project reference to the photos shown. We would like to inform afterwards that the photos shown were only example images of wayside monitoring systems and had no direct project reference to the contents mentioned on the slides."
Herunterladen